Brightside by Bosa BlueSky heads to Public Hearing

w01htcq
View looking west along 104 Avenue from King George Blvd

Surrey Council gave 1st & 2nd Readings on Monday night to Bosa BlueSky’s next project in Surrey City Centre – Brightside – which will now head to Public Hearing and 3rd Reading (Preliminary Approval) in 2 weeks. The project, which has been under application for the past 2 years, is set to transform the former Brick / Sears Outlet store site at City Parkway & 104 Avenue, which has been sitting vacant for numerous years now. Overall, the application is seeking:

  • A General Development Permit (Form & Character) for the entire site to allow for a phased, mixed-used development consisting of 3 high-rise and 2 low-rise buildings, including:
    • 40-Storey residential tower with ground floor retail (Phase 1)
    • 50-Storey mixed-use residential tower with ground floor retail and 17 floors of office in a stepped podium (Future Phase)
    • 50-Storey residential tower with market and rental units (Future Phase)
    • 2.5-Storey market-hall commercial building
    • 2-Storey amenity building
  • A Detailed Development Permit for phase 1 of the project.
  • OCP Amendment and City Centre Plan amendments to allow for up to 7.5 FAR (9.2 FAR net) density.
  • Rezoning
  • Consolidation from 2 existing lots to 2 new lots.
rcapz1h-1
View looking north along City Parkway from Surrey Central Station
omhl8z5
View from public and amenity space within interior of site looking south
vd9bcf4
View looking east along 104 Avenue
i100tin
Future ‘Market-hall’ commercial building in centre of site as part of future phases.

Designed by Perkins & Will, the first phase of the project, a 40-Storey residential tower with ground-floor retail, is to be located at the corner of City Parkway and 104 Avenue and will include:

  • 418 Market Residential Units
  • 2,831 sq.ft. of ground floor Retail

The remaining buildings, subject to future Detailed Development Permit applications, will be located further east along 104 Avenue and north along 105 Avenue. The tallest of the towers, the 50-Storey mixed-use building with 17-Storey office podium, would become the new tallest in Surrey once complete, assuming no other building surpasses it by then, at 554 ft. (169m). The two future low-rise amenity, and market-hall buildings located in the centre of the site are to be set within a publicly accessible plaza that will invite people into the site from 104 Avenue. The plaza will be activated by retail and restaurant spaces at grade, as well as landscaping, and public art, subject to future detailed design.

In total once all phases are complete, the project will include:

  • 1,352 Residential Units (including 200 rental units)
  • 202,146 sq.ft. of Office
  • 37,049 sq.ft. of Retail

dwxdfpf

6uqsvtw

In addition to the buildings on site, the project will also bring into alignment the intersection of City Parkway and 104 Avenue. The north and south portions of City Parkway on either side of 104 Avenue currently do not connect. This alignment is expected to be completed as part of the first phase, with tower 1 to be aligned on an angle with the newly constructed City Parkway.

Phase 1 of the project is expected to be completed by 2025, with the remaining buildings to follow later in the decade. For more on the project:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0350-00.pdf

25-Storey ‘Central City II’ Office Tower heads to Council

The much anticipated ‘Central City II’ office tower will appear before Surrey Council on Monday for 1st & 2nd readings, as part of the first Council meeting since the summer break. Designed by ZGF Architects, the 25-storey (116.5m / 382 ft.) building will be the successor to the iconic Bing Thom designed ‘Central City I’, built in 2003, and bring much needed new office space to Surrey City Centre. Taking design cues from the original tower, while at the same time having its own distinctive architectural expression, the new building will be located just to the south-east of Central City I at the corner of King George Blvd and Old Yale Rd.

In all, the building is proposed to include:

  • 567,114 sq.ft. of AAA Office Space and Fitness Club on levels 2-25
  • 16,168 sq.ft. of ground-oriented retail, restaurant, and cafe space
  • Landscaped roof terraces on levels 3, 5, 10, 21, and 24
  • A new dedication of City Parkway
  • A new private east-west lane along the north side of the building connecting City Parkway to King George Blvd
  • Plazas and Separated Bike Lanes surrounding the building along King George Blvd, Old Yale Rd, and City Parkway
cfdlwpu
View looking South along SkyTrain Guideway
liqdarp
View Looking South-West along King George Blvd
5iodhvn
View looking North-West at corner of King George Blvd & Old Yale Rd
doikrbq
South and East Elevations
nahxypv
West and North Elevations

In terms of design, the building consists of a 25-storey tower with distinctive rust-toned metal panels, above a stepped podium, transitioning to different floor plates at levels 3, 5, 10, 21, and 24. The tower maintains a rounded rectangular form above the podium levels, before transitioning to an elliptical shape – similar to ‘Central City I’ at level 21. Above level 25, the vertical fins extend the curtain wall and frame an additional 2 storeys to conceal the rooftop mechanical equipment, and give the building a 27-storey appearance. The fins also provide space for signage, shown in renderings provided by ZGF, with the Central City logo, similar to the original tower. The bulk of the building’s massing is oriented towards King George Blvd and anchored to Old Yale Rd, creating a strong urban street wall and presence. The building tapers down towards the west, with its 4-storey podium extending to City Parkway, and the SkyTrain guideway.

The main entrance to the building will front onto a new public plaza along Old Yale Rd. This plaza will extend around the building on 3 sides, with retail, restaurant, and cafe space spilling out to activate frontages along City Parkway and King George Blvd. The south-west corner of the site at Old Yale Rd and City Parkway has been identified as a location for a future significant public art piece, subject to separate public art plan process.

hr3b1bl
Ground floor Site Plan
g5aovje
Landscaped outdoor terrace on Level 3
ubnynwa
Landscaped outdoor terrace on Level 5
rnkrgqq
Landscaped outdoor terrace on Level 10
8yt2mdb
Landscaped outdoor terrace on Level 21

Replacing the former Best Buy store at the corner of the existing mall parking lot, Central City II represents just phase 1 of a master redevelopment plan for the remainder of the Central City Shopping Centre site. More details of that plan will come through future development applications for subsequent phases. Earlier this year, the mall’s owner Blackwood Partners announced plans for a 1.5 storey addition to the existing parkade along University Drive which is expected to get underway in the coming months. Upon completion, this will allow for the closure of rooftop parking above parts of the existing mall along Old Yale Rd and eventual redevelopment of the site across from Holland Park.

don4fnr

Concord Pacific an applicant in pair of submissions for towers on 105 Ave

hlznpqu

Two separate Development Applications have been submitted for a pair of projects between University Dr & City Parkway and 105 Ave & 105A Ave, just to the south of the BC Lions Training facility.

According to Surrey’s COSMOS, the application on the westerly block is to allow for 873 residential units (approximately 2 towers above podiums), while the application on the easterly block is to also allow for 2 towers above podiums with no unit count given. The applications are also proposing OCP and City Centre Plan amendments to re-designate the sites from 3.5 FAR to 5.5 FAR to allow for increased density. Interestingly, the applicant on the easterly site is listed as Concord Pacific – indicating a new venture for them in Surrey City Centre, to follow their existing ‘Park’ development near King George. The applicant on the westerly site is listed as IBI Group, although the applications could be related.

The subject sites have been vacant grassed lots for decades, and are bisected by the SkyTrain guideway between Surrey Central Station and Gateway Station. While the area may feel vacant now, just to the south across 105 Avenue, Bosa’s 28 & 37-storey University District towers are expected to begin construction within the next year. Also just to the north at City Parkway and 106 Avenue, Lark Group’s 20-story Legion Veteran’s Village project is now under construction.

62xaezt
Site looking north-east from University Dr & 105 Ave
2kf4sbs
Site looking south-east from University Dr & 105A Ave
xdqfnmd
Site looking south from 105A Ave
hofmc2s
Site looking south-west from 105A Ave & City Parkway
tadgy7k
Site looking north from 105 Ave
okmdx3g
Site’s within City Centre Plan
gmi1m8d
Birds-eye view of Sites