Holland Parkside to bring mix of Housing, Office, Retail, and Public Market

r1mbklb

A new mixed-use development proposed for a vacant piece of land next to Holland Park is set to appear before Council on Monday, February 24 for 1st & 2nd Readings. Known as Holland Parkside, and being developed by Century Group (the same developer as 3 Civic Plaza), the project is proposing to bring a mix of market and rental housing, office, retail, restaurant, public food market, and courtyard green space to the growing neighbourhood surrounding King George Station. Overall, the project is to include:

  • 42 + 36 Storey Market Residential Towers above a townhouse base (818 Units)
  • 19-Storey Rental Residential Tower (204 Units)
  • 10-Storey Mid-Rise Office Tower (212,000 sq.ft. including retail)
  • Ground-level Retail in a double-height podium at the base of the office and rental towers along King George Blvd, including a 2-storey restaurant and large market hall for food vendors
  • A publicly accessible Central Courtyard on level 3 with an urban agriculture and food-related theme
nt6omgl
Perspective along King George Blvd – Rental Residential Tower (Left), Office Mid-Rise (Right), and 2-Storey Retail / Market Hall Podium
ifpdnyl
Perspective along west side of site adjacent to existing Single Family – Market Residential Towers and Townhouse Base
giubk3l
Perspective along 99 Ave – Office Mid-Rise (Left) and Market Residential Tower (Right)
ekejwxd
Perspective along 98A Ave – Market Residential Tower (Left), Rental Residential Tower (Right), Level 3 Courtyard (Centre)
wcmgnxg
A publicly accessible courtyard on level 3 in the centre of the site, accessible via a grand staircase through the site from King George Blvd

Designed by ZGF Architects, the development is to be built in phases over a number of years, subject to market conditions. The current application is for a Rezoning, City Centre Plan Amendment, and General Development Permit (for Form & Character) only. Detailed Development Permits for each phase will be brought forth at later dates under separate applications.

At the south end of the site, a small portion of land will be dedicated to allow for 98A Avenue to bend northward and intersect with ‘George Junction’ a new crescent road to connect through the King George Hub development across the street. At the north end of the site, a new 99 Ave will be constructed, which will then bend south around the development to connect to 98B Ave to the west. The existing single family housing to the west is expected to be redeveloped in the future to 4-6 Storey multi-family, as per the City Centre Plan.

wifvr7x

exvzknf
Contextual view facing North-West
yxejkhk
Contextual View facing South-East
wtmxal3
Contextual View facing North-East

At this time, detailed design of project is still underway, and will continue to be refined through subsequent development permit applications for each phase. The report to Council notes that the first phase is expected to be constructed and ready for occupancy by summer 2024, although does not mention which portion will be developed first. Given that all 4 buildings share a common parkade, podium, and level 3 Central Courtyard, it’s unclear how the project would be built in phases.

For more on the project:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0217-00.pdf

Central City II to proceed to Public Hearing

5iodhvn

After being referred back to Staff by Council on September 16 due to a misunderstanding over building height, Central City II returned to Council tonight to receive 1st & 2nd Readings and the OK to proceed to Public Hearing in 2 weeks. No changes were made to the proposal, which will proceed based on its original 25-storey (382′) height. The re-introduced planning report included better contextual information to help convey to the Mayor and Council how the building will fit into the surrounding area, as well as the sheer volume of office space it will contain given its large floor plate. The Mayor and Council had previously sent the application back to staff, having thought the tower would be shorter than the 35-Storey residential towers across the street at King George. McCallum’s arguments included:

  • “This is not a highrise development”
  • “Twenty-five storeys in our City Centre is way too low.”
  • “The towers at King George Station across the street are taller”
  • “We have only a certain amount of land in our City Centre and it’s really important to make sure we use that land appropriately”

In reality, the 25-Storey office tower would be slightly taller than the 35-storey residential tower across the street due to differences between residential and office floor heights. Central City 2 is proposed at 382 ft. while the Infinity tower at Concord Park Place is 377 ft. Further, if Central City II were built today, it would be the 3rd tallest building in Surrey after 3 Civic Plaza (538 ft.) and Park Avenue West (393 ft.). This would not be the case for long however, with 3 other towers currently under construction exceeding the height of Central City 2. Once those are completed, Central City 2 would be the 6th tallest in Surrey, yet still at comparable height to others in the top 5.

  • 3 Civic Plaza (538 ft.)
  • One Central (438 ft.)
  • Park Boulevard (407 ft.)
  • King George Hub B1 (404 ft.).
  • Park Avenue West (393 ft.)
  • Central City II (382 ft.)
yw7ztox
Comparison of Surrey’s tallest towers (built & under construction) with Central City II

Height aside, the sheer volume of office space to be provided by the building will bring a significant boost to the City Centre, where demand is currently high, and vacancy low. Central City 2 is to contain 567,114sq.ft. of class AAA commercial office space, when currently there is a total of just 1.2 million in the entire City Centre. That’s adding half the current amount of office space in City Centre in a single building. In addition, the building is to contain 16,168 sq.ft. of ground floor retail and restaurant space in its large podium spanning an entire city block. A market analysis commissioned by the developer found the amount of proposed space to be adequate in meeting current demand in City Centre.

ndnffg3
Central City 2 (far right) along with conceptual future redevelopment of mall site
askvvxs
Model of Central City 2 along with conceptual future redevelopment of mall site

More information on the proposal can be found in the planning report below:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0428-00(1).pdf

25-Storey ‘Central City II’ Office Tower heads to Council

The much anticipated ‘Central City II’ office tower will appear before Surrey Council on Monday for 1st & 2nd readings, as part of the first Council meeting since the summer break. Designed by ZGF Architects, the 25-storey (116.5m / 382 ft.) building will be the successor to the iconic Bing Thom designed ‘Central City I’, built in 2003, and bring much needed new office space to Surrey City Centre. Taking design cues from the original tower, while at the same time having its own distinctive architectural expression, the new building will be located just to the south-east of Central City I at the corner of King George Blvd and Old Yale Rd.

In all, the building is proposed to include:

  • 567,114 sq.ft. of AAA Office Space and Fitness Club on levels 2-25
  • 16,168 sq.ft. of ground-oriented retail, restaurant, and cafe space
  • Landscaped roof terraces on levels 3, 5, 10, 21, and 24
  • A new dedication of City Parkway
  • A new private east-west lane along the north side of the building connecting City Parkway to King George Blvd
  • Plazas and Separated Bike Lanes surrounding the building along King George Blvd, Old Yale Rd, and City Parkway
cfdlwpu
View looking South along SkyTrain Guideway
liqdarp
View Looking South-West along King George Blvd
5iodhvn
View looking North-West at corner of King George Blvd & Old Yale Rd
doikrbq
South and East Elevations
nahxypv
West and North Elevations

In terms of design, the building consists of a 25-storey tower with distinctive rust-toned metal panels, above a stepped podium, transitioning to different floor plates at levels 3, 5, 10, 21, and 24. The tower maintains a rounded rectangular form above the podium levels, before transitioning to an elliptical shape – similar to ‘Central City I’ at level 21. Above level 25, the vertical fins extend the curtain wall and frame an additional 2 storeys to conceal the rooftop mechanical equipment, and give the building a 27-storey appearance. The fins also provide space for signage, shown in renderings provided by ZGF, with the Central City logo, similar to the original tower. The bulk of the building’s massing is oriented towards King George Blvd and anchored to Old Yale Rd, creating a strong urban street wall and presence. The building tapers down towards the west, with its 4-storey podium extending to City Parkway, and the SkyTrain guideway.

The main entrance to the building will front onto a new public plaza along Old Yale Rd. This plaza will extend around the building on 3 sides, with retail, restaurant, and cafe space spilling out to activate frontages along City Parkway and King George Blvd. The south-west corner of the site at Old Yale Rd and City Parkway has been identified as a location for a future significant public art piece, subject to separate public art plan process.

hr3b1bl
Ground floor Site Plan
g5aovje
Landscaped outdoor terrace on Level 3
ubnynwa
Landscaped outdoor terrace on Level 5
rnkrgqq
Landscaped outdoor terrace on Level 10
8yt2mdb
Landscaped outdoor terrace on Level 21

Replacing the former Best Buy store at the corner of the existing mall parking lot, Central City II represents just phase 1 of a master redevelopment plan for the remainder of the Central City Shopping Centre site. More details of that plan will come through future development applications for subsequent phases. Earlier this year, the mall’s owner Blackwood Partners announced plans for a 1.5 storey addition to the existing parkade along University Drive which is expected to get underway in the coming months. Upon completion, this will allow for the closure of rooftop parking above parts of the existing mall along Old Yale Rd and eventual redevelopment of the site across from Holland Park.

don4fnr

Bosa’s BlueSky towers heading to Public Hearing

hma8que

Bosa’s BlueSky Properties received 1st & 2nd readings by Council on Monday night for their upcoming, recently re-branded, ‘BlueSky’ project at 104 Avenue and University Drive. The project, previously thought to become the next phase of ‘University District‘ is now set for Public Hearing and 3rd reading (preliminary approval) on July 9.

Released in the Planning Report to Council on Monday were updated renderings for the project, superseding a previous design from the original 2011 application on the site. As part of the new 2018 application, tower heights have increased to 28 & 37 storeys, and incorporate a more contemporary ‘box-shaped’ architectural design. In addition, a new north-south lane will be dedicated along the site’s eastern property line, as per the City Centre Plan, helping to achieve a finer-grained road network.

rcvq6u5
View of proposed towers facing west
g3rebli
View of proposed towers facing east
oswtb4y
Rendering of 3-storey townhouse podium fronting University Dr
6w4drgl
Rendering of amenity podium with ground floor retail and rooftop pool at 104 Ave & University Dr

Designed by Vancouver’s ZGF Architects, the two condo towers will contain a total of 742 units above a 3-storey townhouse base fronting both 105 Ave & University Dr, and 4-storey amenity podium with ground floor retail and rooftop pool at the corner of University Dr & 104 Ave. The project will create a strong urban streetscape along both University Dr and 105 Ave, and help transition density further northward from the city’s emerging civic core. The project is targeted for completion and occupancy by summer 2022.

For more on the application, the full Planning Report to Council can be found here:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0058-00.pdf